What business analysts do

A business analyst makes sure a team builds the right change, for the right reason, and can prove it helped. This lesson explains the job, the BABOK Guide's core concepts and knowledge areas as work you will actually do, and how analysts work in agile teams. You start as the new business analyst on Mangrove Market's project to move partner-shop phone orders into the Partner app.

By the end you can

  • Explain the business analyst's job in one sentence, and find the need hidden inside a request that names a solution
  • Use the six core concepts (change, need, solution, stakeholder, value, context) to check any proposed change
  • Say which knowledge area you are working in on a real project, and why they are not phases
  • Tell the business analyst, product manager, product owner and tester apart, and work a sprint ahead in an agile team
  • Measure a problem with a query, then write a problem statement and measurable objectives

The everyday picture

You walk into a pharmacy and ask for a strong painkiller. A careless pharmacist sells you the box. A good one asks a few questions first. Where does it hurt? Since when? What else do you take? Sometimes the answer is the painkiller. Sometimes it is a cheaper one, or a different medicine, or a visit to a doctor, because the pain is a sign of something else. The pharmacist respects your request, but works on your need.

The good pharmacist also checks the context (other medicines, allergies), thinks about who else is affected, and knows what success looks like (the pain gone in two days, no side effects). A business analyst does the same job for an organisation. People arrive asking for a specific fix. The analyst finds out what is wrong, who is affected and what a good result would be, then helps choose and shape the fix.

The job: need first, then the change, then the value

A (BA) helps an organisation change in a way that is worth it. The most widely used description of the work is the , published by IIBA. It describes business analysis as enabling change in an organisation by defining needs and recommending solutions that deliver value to stakeholders. This course follows its structure, version 3 from 2015.

In practice the job has three parts that repeat all through a project:

  1. Understand the need. What problem or opportunity is there, for whom, how big, and how do we know?
  2. Define the change. What must be true of a solution, what will people do differently, and what are the rules, data and edge cases? This becomes the requirements the team builds and tests against.
  3. Make sure it delivers value. Did the change solve the problem? If not, why not?

The first part is the hardest, because most work arrives as a solution in disguise. In your first week two requests land. The head of partner sales: "Build a phone-order screen for the reps so they can type orders in faster." A finance analyst: "Force the shops to use the app. Switch off phone orders." These are opposite solutions, and neither says what the pain is.

Use the move from Problems before solutions: split each request into a goal, a pain and a proposed fix. The sales head's goal is happy shops and reps; the pain is time spent writing and re-keying orders; the fix is a screen. Finance's goal is lower cost; the pain is corrections after delivery; the fix is a rule. The shared need underneath is "partner orders that are quick to place and arrive right". Keep both fixes on the list as options, and pick none until the need is measured.

Quick check

Imran forwards you a request from a DC manager: "Add a barcode scanner to the Partner app." What is your best first reply?

Six core concepts to check any change

BABOK's (BACCM) names six ideas that every piece of analysis touches. They are useful because they are connected: change one, and you have to check the other five. Here they are on your project.

  • Need: a problem or opportunity. About 1,500 partner orders a week still come by phone to about 40 sales reps, and about 1 phone order in 12 (about 125 a week) is corrected after delivery, at about $9 each.
  • Change: the move from today to a better state. Partner orders move from the phone into the Partner app, and the reps' daily work changes with them.
  • Solution: a specific way to meet the need. It is not chosen yet. Candidates so far: a phone-order screen for reps, switching the phone line off, or changes to the app itself.
  • Stakeholder: anyone with a relationship to the need, the change or the solution. Ravi and about 1,800 partner shops, the 40 reps, the head of partner sales (the project's ), finance credit control, the four DCs and about 120 drivers, Lagoon Digital and Imran.
  • Value: what the change is worth to a stakeholder. For Mangrove, moving to 75% app share is worth about $40,000 a year in (Unit economics worked it out). For Ravi it might be fewer wrong deliveries. For a rep it might be time back, or a loss if their bonus counts the orders they enter.
  • Context: the circumstances around the change. Shops buy on credit with limits set by finance, orders before 6 pm are delivered next day, mobile data is patchy in places, and Lagoon works under a contract.

Use the six as a checklist for every candidate solution. Take "switch off phone orders". Need: it removes phone corrections. Value: good for finance, unknown for Ravi. Context: what about a shop with patchy data, or an order over its credit limit? Stakeholders: will some shops buy from another wholesaler instead? Two minutes with the model turns a confident request into four questions.

Context: credit limits, cut-off, patchy data Need 125 fixes a week drives Change orders to the app needs Solution not chosen yet delivers Value about $40k a year Stakeholders 1,800 shops 40 sales reps partner sales finance DCs, drivers Lagoon Digital Imran have it use it judge it Change one concept, re-check the other five
The six BABOK core concepts on the phone-orders project. A measured need drives the change, the solution is still open, and value only counts when each stakeholder group judges it. Context frames everything: credit, the 6 pm cut-off and patchy mobile data.

Quick check

The head of partner sales says "the reps will love this change". You plan short talks with five reps to ask what they would gain and lose. Which core concept are you testing?

Six knowledge areas: what you will actually do

BABOK groups the BA's tasks into six . Don't memorise them as a list. Read them as six kinds of work you will do on this project, often in the same week.

Knowledge areaWhat it coversOn the phone-orders project
Business Analysis Planning and MonitoringPlan the analysis: approach, stakeholder engagement, who approves what, where information livesYour one-page BA approach plan in week 1, reviewed every few sprints
Elicitation and CollaborationDraw out information from people and documents, confirm it, share itInterviews with Ravi and reps, a day with a rep, a workshop (ba-02)
Strategy AnalysisCurrent state, future state, risks, and the change strategyMeasuring today's phone orders, setting the 75% target, comparing "switch off phones" with improving the app
Requirements Analysis and Design DefinitionSpecify, model, verify and validate requirements; define design options and recommend oneProcess models (ba-03), requirements and rules (ba-04), user stories (ba-05)
Requirements Life Cycle ManagementTrace, maintain and prioritise requirements, assess changes, get approvalLinking each story to an objective and a test; handling change requests (ba-06)
Solution EvaluationMeasure how a solution performs, find what limits its value, recommend actionsAfter the pilot: are app share and corrections moving? If not, why? (ba-06)

BABOK says plainly that the knowledge areas are not phases and are not a method to follow in order. On an agile project you touch all six inside one sprint, at small scale. In one week you might confirm interview notes (elicitation), write examples for the credit story (requirements analysis), update a trace link after Imran reorders the backlog (life cycle management) and check pilot numbers (solution evaluation).

The guide also lists 50 techniques the tasks use (interviews, process modelling, decision tables and many more) and five perspectives on how the work changes by setting: Agile, Business Intelligence, Information Technology, Business Architecture and Business Process Management. Your project mixes Agile (Lagoon builds in sprints) with Business Process Management (the real change is how orders flow through reps, finance and the DCs).

Quick check

Before writing any requirement, you agree with Imran that he approves stories, that the sponsor approves anything that changes the 75% target, and that all requirements live in the team's backlog tool. Which knowledge area is this?

Who does what, and how a BA works in an agile team

On a real team the roles overlap, so agree them early. What a product manager actually does covers the product manager and project manager in depth. Here is how the BA fits in.

RoleMain questionOn this project
Business analystWhat is the real need, and what must be true of a solution?You: evidence, models, requirements, acceptance examples, UAT support
Product managerIs this the most valuable problem to work on, and did it help?Imran, for the whole Partner app
Product ownerIn what order does the team build, and is this item done?Imran again: he orders the backlog Lagoon works from
Project managerWill it be delivered on time, on budget, with risks handled?Lagoon Digital's project manager, against their contract
Tester (QA)Does it work, and how could it break?Lagoon's tester; you help with examples and with

The BA's special value is staying neutral about the solution while being precise about the need. Imran decides the order; you make sure each item is understood and earns its place.

How the work flows depends on the project. In a project, the BA writes a full requirements document up front, it is signed off, and changes go through formal change control. That fits work where the rules are known and change is expensive, such as a regulatory report. In an agile project the requirements grow with the product. Lagoon builds in two-week , so you work one or two sprints ahead, with just enough detail just in time. A story for next sprint needs examples and edge cases. A story three months away needs one line and a link to its objective.

Three habits make this work.

  • . The Scrum Guide describes it as an ongoing activity. You bring the next stories with their purpose, rules and examples; the team asks questions and sizes them.
  • . Before a story is built, you (the business view), a Lagoon developer (how could we build it?) and a Lagoon tester (what could happen?) talk it through and agree examples. The Agile Alliance glossary warns against keeping it to exactly three people when someone else knows the answer, such as a finance analyst for the credit story.
  • Sprint review with real users. At the end of each sprint, Ravi or a rep tries the new piece. Their reactions go into the backlog before the next refinement.

Your project is a hybrid, like most vendor projects. Lagoon's contract (see Working with vendors) fixes the budget and main scope up front, so objectives and business requirements are agreed early; the detail stays just in time.

Business You, the BA Lagoon Digital 1. Refine a sprint ahead Imran ranks the backlog Story with examples Dev, tester probe cases goal talk 2. During the sprint Ravi checks a detail Same-day answers Build and test ask check 3. Sprint review Ravi, reps try it Feedback to backlog Demo the increment demo notes feedback to next sprint
The BA works between the business and the vendor in every sprint: stories refined a sprint ahead with examples, questions answered the same day while Lagoon builds, and review feedback fed back into the backlog Imran ranks.

Quick check

It is sprint 2. A keen new BA has already written detailed acceptance criteria for all 40 stories in the project. What is the main risk?

Measure the problem, then set objectives

Before you define any solution, measure the need. Ask Tomás for one week of partner orders by channel and count corrections. The query is in the Practice section. Here is what it shows:

Output
channel   orders   corrected   corrected_pct
app        2,500        25          1.0
phone      1,500       125          8.3
total      4,000       150

App share today: 2,500 / 4,000 = 62.5%, about 62%

Then write a in the form from pm-02: a specific user, an obstacle, a measurable cost and evidence, with no solution words.

Markdown
Partner-shop owners need to reorder stock quickly and receive exactly what
they ordered, but about 1,500 orders a week still go by phone to about 40
sales reps, who write them down and enter them later. About 1 phone order
in 12 (about 125 a week) is corrected after delivery, at about $9 each, and
a phone order costs about $1.75 to serve against $0.20 in the app.
We know because of one week of order data (Tomas) and the pm-27 cost study.

Next, turn the problem into . Each has a metric, a baseline, a target, a date and a named source for the number:

  • O1, app share: partner orders placed in the Partner app, from about 62% to 75% of all partner orders. That is about 500 fewer phone orders a week (1,500 down to about 1,000).
  • O2, corrections: phone-order corrections after delivery, from about 125 to under 60 a week, while app orders stay at about 1 correction in 100.

Writing the numbers down teaches you something. If O1 succeeds and nothing else changes, about 1,000 phone orders a week at 1 in 12 still gives about 83 corrections. O2 can't be met by moving orders alone. The remaining phone orders must go wrong far less often: under 60 in 1,000 is under 6%, or better than about 1 in 17. So the project must find out why phone orders go wrong, which is what elicitation in ba-02 is for. The second half of O2 is a guard: it stops the team "winning" by moving errors from the phone into the app.

Agree the date with the sponsor and write it into each objective. Without a date and a source, nobody can check the objective at the end, in Solution Evaluation.

Quick check

Which objective could you check at the end of the project?

Think first: a sponsor says "we don't need analysis, everyone knows shops should use the app". What would you say?

Agree with the direction and ask for one week to measure it. "Everyone knows" covers the change but not the need: nobody yet knows why about 1,500 orders a week still come by phone. If the reason is speed, credit, missing products or the reps' bonus, each needs a different fix, and forcing shops onto the app may fix none of them. A week of data and a few interviews cost little next to three months of building the wrong thing.

Do it

Produce a one-page problem statement and BA approach plan for a project you are on, or for the phone-orders project.

  1. Write down each request as it arrived

    Use the requester's words. Then split it into goal, pain and proposed fix. Keep every fix as an option, not a requirement.

  2. Measure the need

    Get one period of real data, ideally a few weeks. Count the problem, its rate and its cost, and write the arithmetic down so others can check it.

    Output
    Phone corrections   125 a week x $9          = $1,125 a week (about $58,000 a year)
    Rep time            1,500 orders x 10 min    = 250 hours a week
    O1 at 75% app share 4,000 x 25%              = about 1,000 phone orders a week
    O2 check            1,000 x 1/12             = about 83 corrections (target: under 60)
  3. Fill in the one-page plan

    Keep it to one page. It is a plan for the analysis, not a requirements document.

    Markdown
    # Problem statement and BA approach: (project name)
    
    ## Problem
    (Who) needs to (do what) but (obstacle), which causes (measured cost).
    We know because (evidence and its source).
    
    ## Objectives
    | ID | Metric          | Baseline | Target    | By (date) | Source         |
    |----|-----------------|----------|-----------|-----------|----------------|
    | O1 | App share       | 62%      | 75%       |           | weekly query   |
    | O2 | Phone fixes/wk  | 125      | under 60  |           | weekly query   |
    
    ## Options on the table (not chosen)
    - (each request as it arrived, with who asked)
    
    ## Stakeholders to involve first
    - (names or roles, and why each matters)
    
    ## Approach
    - Way of working: (agile / plan-driven / hybrid, and why)
    - Elicitation first: (interviews, observation, data, workshop)
    - Where requirements live: (backlog tool, documents)
    - Who approves: stories (   ), changes to objectives (   )
    - How we will check value after launch: (metrics, when, who)
  4. Play it back

    Show it to the product manager and the sponsor in one short meeting. Ask: is the problem right, are the targets right, who is missing? Change it, then record the agreed version and the date.

Bring it to your team

Ask these at the start of your next project, or now if you are already in one.

  • What problem are we solving, in numbers, and where does each number come from?
  • Which of the things on our list are requests for a solution, and what need is each one meant to meet?
  • Who decides the backlog order, and who approves a change to the objectives?
  • How far ahead of the sprint are our stories ready, and are the three amigos talking before each one is built?
  • On what date, and with which query, will we check the objectives?

Red flags

  • The first requirement is the sponsor's proposed solution, copied word for word.
  • Objectives with no baseline, or measured in features shipped.
  • A 60-page requirements document before the first sprint of an agile project.
  • Developers and testers meeting a story for the first time in sprint planning.
  • Nobody owns checking the numbers after go-live.

Practice

Measure the problem before you define the solution

The table partner_order holds one week of partner orders: id, shop_id, channel ('app' or 'phone'), placed_on (a date) and corrected (true if the order was corrected after delivery). For each channel, return channel, orders (the number of orders), corrected (how many were corrected) and corrected_pct (corrected as a percentage of orders, rounded to 1 decimal place).

SQL exerciseRuns in a real PostgreSQL inside your browser
-- Orders, corrections and correction rate per channel
SELECT channel,
       count(*) AS orders
FROM partner_order
GROUP BY channel;
Ctrl + Enter runs
Show a solution
SQL
SELECT channel,
       count(*) AS orders,
       count(*) FILTER (WHERE corrected) AS corrected,
       round(100.0 * count(*) FILTER (WHERE corrected) / count(*), 1) AS corrected_pct
FROM partner_order
GROUP BY channel;
-- 100.0 (not 100) makes the division decimal; with whole numbers
-- 125 * 100 / 1500 gives 8, and the phone rate would look better than it is.
Pass the exercise to finish this task.

Find the need behind two requests

Two more requests reach you. A DC operations lead: "Make reps send orders to us by 4 pm." Ravi: "Put a button in the app to call my rep." For each one, write the goal, the pain and the proposed fix; say which BABOK core concept you would check first and why; and write one question you would ask the requester.

  • Each request is split into a goal, a pain and a proposed fix, with the fix kept as an option
  • You name a core concept for each and link it to something real on the project (the 6 pm cut-off, credit, the reps)
  • Your questions ask about the last time the problem happened or how often, not whether they like the idea
  • You notice that both requests hint at why phone orders exist, and say you would test that in elicitation
Show a model answer

DC lead. Goal: pick and ship on time. Pain: orders arrive late in the evening, so picking plans change. Fix: a 4 pm deadline for reps. Check Context first: the 6 pm cut-off is a promise to shops, and moving it for reps may break next-day delivery for orders phoned in after 4 pm. Question: "On the last day orders came in late, how many came after 4 pm, and what did that do to the next morning's picking?"

Ravi. Goal: get his order right without fuss. Pain: something in the app does not work for him, so he wants a person. Fix: a call button. Check Need first: the button would add phone orders, the opposite of the change. Question: "The last time you phoned your rep instead of using the app, what were you trying to do?" Both requests suggest reasons shops and reps still use the phone. Treat them as things to test in interviews and observation, not as facts yet.

Check yourself

Halfway through the project, Lagoon Digital's tester asks you what should happen when a shop orders 3 cases but the DC has only 2. Nobody has decided. What do you do?

A sponsor approves your objective "75% app share". After launch, app share reaches 76% but corrections are still about 120 a week. What does this show?

Your company wants to replace a tax reporting system. The tax rules are fixed by law, the format is set by the tax office, and every change needs an audit trail. Which approach fits best?

Flashcards

Open my review

Key takeaways

  • A BA understands the need, defines the change and checks the value. Most requests are solutions in disguise; keep them as options until the need is measured.
  • The six core concepts are connected: change one, and re-check need, solution, stakeholders, value and context.
  • The six knowledge areas are kinds of work, not phases. On an agile project you do all six every sprint, at small scale.
  • In agile teams, work a sprint or two ahead, refine with the three amigos and bring real users to reviews; vendor projects are usually a hybrid.
  • Measure first, then write a problem statement and objectives with baseline, target, date and source, and test that the objectives can actually be met.

Sources and further reading

Episode transcriptTwo requests, one hidden need · about 11 minutes · tap any line to play from there
  1. NadiaImran, picture your first week as the business analyst on a new project. Two emails arrive on day one. Which do you act on?
  2. ImranGo on, what do they say?
  3. NadiaThe head of partner sales writes, build a phone order screen for the reps so they can type orders in faster. A finance analyst writes, force the shops to use the app and switch off phone orders.
  4. ImranThose are opposites. One makes phone orders easier, the other bans them.
  5. NadiaExactly. And today's episode is about why a good business analyst acts on neither email yet, and what they do instead.
  6. NadiaStart with a pharmacy. You walk in and ask for a strong painkiller. A careless pharmacist sells you the box. A good one asks where it hurts, since when, and what else you take.
  7. ImranAnd sometimes the answer is still the painkiller.
  8. NadiaSometimes. Sometimes it's a cheaper one, or a visit to a doctor, because the pain is a sign of something else. The good pharmacist respects your request but works on your need. That's the business analyst's job in one picture.
  9. ImranSo what is the job, in plain words?
  10. NadiaThree parts that repeat all through a project. Understand the need. Define the change. And make sure the change delivers value.
  11. NadiaThe BABOK Guide, which is the standard body of knowledge from the International Institute of Business Analysis, describes the work as enabling change by defining needs and recommending solutions that deliver value to stakeholders.
  12. ImranSo both emails describe a fix, and neither says what hurts.
  13. NadiaSolutions in disguise. So split each one into a goal, a pain and a proposed fix. Sales wants happy shops and reps, the pain is time spent writing and re-keying orders, the fix is a screen. Finance wants lower cost, the pain is corrections after delivery, the fix is a rule.
  14. ImranAnd underneath both, partner orders that are quick to place and arrive right.
  15. NadiaThat's the need. Both fixes stay on the list as options. Nobody picks one until the need is measured.
  16. ImranThe lesson has a model for checking a change. Six core concepts.
  17. NadiaThe first diagram shows them on this project. If you can see it, there's a column of four boxes on the left, need, change, solution and value, with arrows running down. On the right, one tall box of stakeholders. And a dashed frame around everything, which is the context.
  18. ImranWalk me down the column.
  19. NadiaThe need is measured. About fifteen hundred partner orders a week come by phone to about forty sales reps, and roughly one phone order in twelve is corrected after delivery. That's about a hundred and twenty-five a week, at about nine dollars each.
  20. NadiaThe change is orders moving into the Partner app. The solution box is drawn dashed, because it's not chosen yet. And value at the bottom, about forty thousand dollars a year in cost to serve if app share reaches seventy-five percent.
  21. ImranWhy are stakeholders on the side instead of in the column?
  22. NadiaBecause they touch every step. They have the need, they use the solution, and they judge the value. And they judge it differently. For finance, fewer corrections is clearly good. For a rep whose bonus counts the orders they enter, the same change might feel like a loss.
  23. ImranAnd context is the frame. Credit limits, the six pm cut-off, patchy mobile data in some areas.
  24. NadiaRight. The point of the model is that the six are connected. Change one and re-check the other five. Try it on the finance email, switch off phone orders. It removes phone corrections. But what about a shop with patchy data? Or an order over its credit limit? Will some shops go to another wholesaler instead?
  25. ImranFour questions out of one confident sentence.
  26. NadiaIn about two minutes.
  27. ImranThen there are the six knowledge areas. That list always sounds like an exam to me.
  28. NadiaTreat them as six kinds of work you'll do on this project. Planning and monitoring is your one page approach plan in week one. Elicitation and collaboration is interviewing Ravi and the reps. Strategy analysis is measuring today and setting the seventy-five percent target.
  29. NadiaRequirements analysis and design definition is the process models, rules and stories. Requirements life cycle management is tracing and handling change requests. And solution evaluation is checking the numbers after the pilot.
  30. ImranSo it's a sequence. Plan, elicit, analyse, build, evaluate.
  31. NadiaThat's the common trap, Imran. The guide says the knowledge areas are not phases. On an agile project you touch all six in a single sprint, at small scale. In one week you might confirm interview notes, write examples for the credit story, update a trace link and look at pilot numbers.
  32. ImranWhere do I fit next to the business analyst, then? I'm the product manager on this.
  33. NadiaYou ask whether this is the most valuable problem and whether it helped. You also act as product owner, so you decide the order of the backlog Lagoon Digital builds from. The business analyst asks what the real need is and what must be true of any solution. Lagoon's tester asks how it could break.
  34. ImranAnd the second diagram shows how that runs in a sprint.
  35. NadiaThree columns. Business on the left, the business analyst in the middle, Lagoon Digital on the right. Three rows. Refinement a sprint ahead, then during the sprint, then the sprint review. A dashed arrow loops from the bottom back to the top.
  36. NadiaIn refinement you bring a story with examples, and a developer and a tester probe the cases. That talk is called the three amigos. The business view, a developer and a tester, agreeing examples before anything is built.
  37. ImranDoes it have to be exactly three people?
  38. NadiaNo, and the Agile Alliance glossary warns about that. If the credit story needs a finance analyst, bring one. During the sprint you answer questions the same day. At the review, Ravi or a rep tries the new piece, and their feedback goes back into the backlog you rank.
  39. ImranSo the analyst works one or two sprints ahead.
  40. NadiaWith just enough detail, just in time. A story for next sprint needs examples and edge cases. A story three months away needs one line and a link to its objective.
  41. ImranI once saw a keen analyst write full acceptance criteria for forty stories in sprint two.
  42. NadiaAnd by sprint six, half of it was wrong, because every review taught the team something. That's the waste just in time avoids.
  43. ImranSo is up front detail always wrong?
  44. NadiaNo. A plan-driven approach still fits some work, like a tax report where the rules are fixed by law. And vendor projects like this one are usually a hybrid. The contract fixes budget and main scope early, and the detail stays just in time.
  45. ImranBack to the first week. What actually happens?
  46. NadiaYou ask Tomás for one week of orders. By Wednesday you have the table. A hundred and twenty-five of fifteen hundred phone orders corrected, against twenty-five of two thousand five hundred app orders.
  47. ImranSo about eight point three percent for phone and one percent for the app.
  48. NadiaAnd the cost. A hundred and twenty-five corrections at nine dollars is about eleven hundred dollars a week, roughly fifty-eight thousand a year. Plus about two hundred and fifty hours of rep time every week.
  49. ImranThen the objectives. App share from about sixty-two percent to seventy-five. And phone order corrections from about a hundred and twenty-five to under sixty a week.
  50. NadiaWriting it down teaches you something. Say app share hits seventy-five percent. About a thousand phone orders a week remain. At one in twelve, that's still about eighty-three corrections.
  51. ImranSo moving orders alone can't hit under sixty.
  52. NadiaRight. The remaining phone orders must go wrong far less often, better than about one in seventeen. So the project has to find out why phone orders go wrong. And the objective has a guard too, app orders stay at about one correction in a hundred, so nobody wins by moving errors into the app.
  53. ImranAnd the practice query measures exactly that table.
  54. NadiaPer channel, count the orders, count the corrected ones, and work out the percentage rounded to one decimal place. One small trap. Multiply by a hundred point zero, not a hundred, or whole number division turns eight point three into eight.
  55. ImranAnd the Do it section?
  56. NadiaA one page problem statement and approach plan. Write each request in the requester's own words and split it. Measure the need and write the arithmetic down.
  57. NadiaThen fill in the page, with the problem, the objectives with baseline, target, date and source, the options still on the table, who to involve first, and who approves what.
  58. ImranAnd then?
  59. NadiaPlay it back to the product manager and the sponsor in one short meeting, and record the agreed version.
  60. ImranQuestions for my next project kick-off, then. What problem are we solving, in numbers, and where does each number come from? Which items on our list are really solution requests? And who approves a change to the objectives?
  61. NadiaI'd add one. On what date, and with which query, will we check the objectives? If nobody owns that, nobody will check.
  62. NadiaA quick one to think about. The sponsor says, we don't need analysis, everyone knows shops should use the app. What do you say? Take a second.
  63. ImranI'd agree with the direction and ask for a week to measure it. Everyone knows the change, but nobody knows why fifteen hundred orders a week still come by phone.
  64. NadiaAnd if the reason is speed, credit, missing products or the reps' bonus, each needs a different fix. A week of data costs little next to three months of building the wrong thing.
  65. ImranMy summary. One, most requests are solutions in disguise, so keep them as options until the need is measured. Two, the six core concepts are connected, change one and re-check the rest. Three, the knowledge areas are kinds of work you do every sprint.
  66. NadiaGood. I'd add that an objective needs a baseline, a target, a date and a source, and you should check it can actually be met before anyone signs it.
  67. ImranSo why do shops still phone?
  68. NadiaNext time. We map the stakeholders, sit with a rep for a day, interview Ravi, and find out.
Finished reading?Mark it complete to fill in its stop on your course line.

Use it at work

Monthly sales report

Revenue, orders and average order value per month, with the change on the month before.

Open in the SQL Lab