Executive updates and presentations

Senior leaders give you a few minutes and a lot of questions. This lesson shows you how to lead with the answer, frame a proposal as situation, complication and resolution, write updates that bring bad news early, present a business case to a managing director in 20 minutes, and handle the tough questions calmly.

By the end you can

  • Lead with the answer and support it with a small pyramid of grouped reasons
  • Frame any proposal as situation, complication and resolution in three sentences
  • Write a weekly or monthly update that a leader reads in one minute and trusts
  • Build a five-slide, answer-first business case for a managing director
  • Prepare a bank of tough questions and answer each in one sentence with one piece of evidence

The everyday picture

You hurt your ankle playing football and go for an X-ray. The doctor walks in and says: "Good news first. It isn't broken. It's a bad sprain. Rest it for a week, then start gentle exercises." Only then does she show you the image and point at the ligament. You ask, "Will I play in the match next month?" She says, "I don't know yet. If the swelling is down when I see you in ten days, probably yes."

She gave you the answer first, then the reasons, then the evidence. When she did not know, she said so and told you when she would. You trusted her more because of it.

Presenting to a senior leader works the same way. The answer comes first, the reasons second, the evidence for whoever wants it, and an honest "I don't know yet, here is when I will" beats a confident guess every time.

Answer first, then the reasons

Most of us explain things in the order we worked them out: the background, the data, the analysis, and finally the conclusion. Senior readers want the reverse. They have many decisions waiting and they read from the top until they have enough. If the answer is at the bottom, many of them never reach it.

Barbara Minto, who joined McKinsey in 1963 as the firm's first female MBA professional hire, turned this into a method she called the , published as The Pyramid Principle in 1985. The structure has three levels:

  • The answer at the top, in one or two sentences: what you recommend and why it matters.
  • Three or so reasons below it, each a full sentence that supports the answer. The reasons in a group should be the same kind of idea, should not overlap, and together should cover the case. Minto calls this , mutually exclusive and collectively exhaustive.
  • Evidence below each reason: numbers, trials, quotes, sources.

You still think bottom-up, from the data to the conclusion. You present top-down. Military writers have a short name for the same habit: BLUF, bottom line up front.

A quick test for any deck or memo: read only the headings or slide titles, in order. If they tell the whole story as full sentences, the structure works. If they read "Background", "Analysis", "Options", "Next steps", the reader has to do the work you should have done. Sentence titles are often called .

Quick check

Which opening line of a presentation to the managing director is answer-first?

Answer do X, worth Y Problem 7% of orders Fix daily counts Risk pilot, gates cut data store trial pre-mortem think: bottom-up present: top-down
The pyramid. You work from the evidence up to the answer (left arrow), then present from the answer down (right arrow), so a busy reader can stop after the top box and still know what you want. Each reason is a full sentence backed by its own evidence.

Situation, complication, resolution

The pyramid tells you where the answer goes. The opening tells the reader why they should care. Minto's introduction has four parts: the situation (something the reader already knows and agrees with), the complication (what changed, or why the situation is no longer fine), the question this raises in the reader's mind, and the answer. Consultants often shorten it to SCR: situation, complication, resolution, with the question left unsaid.

Each part should be one or two sentences:

  • Situation: "'Now' delivery is our headline promise. Offline receiving lifted stock accuracy from 82% to 88% and cut the share of orders with a missing item from 9% to 7%."
  • Complication: "Progress has stalled. 4,200 orders a day still lose an item, more than half of those items are 300 fast movers, and we count them once a month, so a wrong record stays wrong for two weeks on average."
  • Resolution: "Count those 300 items every afternoon and the full range quarterly instead of monthly, starting with a four-week pilot in 20 stores."

With senior audiences, put the resolution first and use the situation and complication as the reason. That gives you an opening of three sentences: the answer, then "here is why".

Three things go wrong with SCR. The situation turns into a history lesson; keep it to what the reader already accepts. The complication is not a complication: "we want to improve accuracy" is a wish, while "progress has stalled and rivals open in three of our cities this year" is a change that demands a response. And the resolution answers a different question from the one the complication raised. If the complication is about fast movers, the resolution must be about fast movers.

Quick check

Which sentence works as the complication in an SCR opening about the Partner app?

Executive updates that bring bad news early

Between big presentations, leaders follow your work through short written updates, weekly for a pilot or a launch, monthly for a steady product. A good update is read in one minute and has the same shape every time, so readers learn where to look:

  1. Status in one line, with the reason: on track, at risk or off track.
  2. Three to five numbers against their targets, with the trend. Include the guardrails.
  3. What changed since the last update.
  4. Decisions needed from the reader, each with a date. Write "none this week" when there are none, so the reader knows you checked.
  5. Risks and what you are doing about each.
  6. The next update date.

Many teams colour the status green, amber or red. The colours only help if they follow rules everyone knows. A workable set: green means on plan; amber means at risk, and the team has a fix that needs no help; red means off plan, and the team needs a decision or help from the reader. Without rules you get what people call watermelon reporting: green outside, red inside. Every update says green until the week the project is suddenly red, and the leader learns that your green means nothing.

The rule underneath is no surprises. Bad news should reach a leader early, from you, in private, with what you are doing about it. The first time the managing director hears that the pilot is slipping should never be in a room full of people. For deeper reviews of a product's numbers, use the metric review format in Metric reviews that change decisions.

Quick check

A vendor's build has failed testing twice and the pilot date will slip by two weeks unless the scope is cut. The team has a proposal but needs the sponsor to choose. What status is honest?

Presenting a business case to a managing director

A managing director weighs a few things in every case, whatever the industry: money (margin, cash, payback), risk (what happens if it fails, and whether it can be undone), customers and competitors, people (the staff who must work differently), and fit with the strategy already agreed. Your case should answer each one before she asks. The calculations themselves (ROI, payback, NPV, sensitivity ranges) are covered in Business cases; here the subject is how you present them.

Before the meeting. Talk privately to each person whose view the managing director will ask for. Agree the numbers with the head of finance, so finance does not challenge them in the room. Hear the strongest objection from the person most likely to oppose you, and change the plan where they are right. Toyota calls this groundwork nemawashi; many teams call it pre-wiring. Send the memo (Writing for decisions) as a pre-read a day ahead.

In the room. For a 20-minute slot, plan about 5 minutes of presenting and 15 of discussion. The discussion is where the decision gets made, so protect it. Five slides are usually enough, each with an action title:

  1. The answer and the decision you need today.
  2. The problem in numbers: situation and complication.
  3. The options, judged on the same criteria, and why you recommend one.
  4. The money: cost, value, payback, a low, base and high case, and what you did not count.
  5. Risks, gates, and what you are asking for today compared with later.

Everything else goes in an appendix you can jump to when asked. Be clear about the kind of money. Sales kept and margin kept are different numbers, and a leader who discovers the difference herself stops trusting the rest. Give ranges, and name the one assumption that would change your answer.

At the end, say the decision back in one sentence ("So: the pilot is approved, the rollout follows if the three gates pass, and the scanners come back to you separately") and wait for a yes. Within 24 hours, send a short note with the decision, the conditions, the actions with owners and dates, and any open questions from the meeting.

Handling tough questions

Most tough questions are predictable, so prepare for them like an exam. List 15 to 20 questions from the point of view of everyone in the room: the managing director, finance, operations, technology, the sceptic. Rank them by how likely they are and how much damage a weak answer would do. For the top eight, write a one-sentence answer, the one piece of evidence behind it, and where it is in the appendix. Then rehearse with a colleague who plays the toughest person in the room. Some teams call this rehearsal a murder board.

In the room, use the same rhythm for every question:

  1. Listen to the end, without planning your answer while she is still talking.
  2. Pause. Two seconds of silence gives you time to think, and it looks calm.
  3. If it is unclear, restate it: "Are you asking whether the pilot stores are typical, or whether 20 is enough?"
  4. Answer in one sentence, the claim first.
  5. Add one piece of evidence: a number with its source, or the slide where it lives.
  6. Stop, and check: "Does that answer it?"

Some questions need more care:

  • You don't know. Say so, give what you do know, and commit to a time: "I don't have the split by city here. I'll send it by 3 pm today." Never invent a number to fill a silence. A wrong number said with confidence will be remembered longer than the whole presentation.
  • A number is challenged. Give its source and range. If you were wrong, say so and say what changes in the decision. Often the answer is "nothing, the low case still pays back".
  • "Why not just do X?" Treat X as one more option and compare it on your criteria. Sometimes X is better, and saying so builds trust.
  • The question behind the question. "What happens during the festival?" usually means "Will this hurt sales in my biggest weeks?" Answer both.
  • "Just give me a date." Give a range with how sure you are and what will narrow it: "Most likely the week after the festival freeze. I'll be sure after the pilot readout on 4 December."
  • Someone who is not in the room. "What does the head of store operations think?" Represent her view fairly, including where she disagrees. Better still, invite her.

Quick check

The managing director asks, "Is this going to make the festival harder for the stores?" What is the best first sentence of your answer?

Listen to end Is it clear? no restate it yes Do you know? no say so, give a time yes One-line answer claim Add one fact source Stop. Check. her turn
The rhythm for any tough question. If the question is unclear, restate it and listen again. If you know the answer, give it in one line with one fact and stop. If you don't, say so and give a time for the answer; never fill the silence with a guess.

Do it

Prepare a 20-minute decision meeting with a senior leader: the answer, the deck outline, the numbers, the question bank, the follow-up and the update you will send while the work runs.

  1. Write the answer in one sentence

    Use this shape and fill every bracket with a number or a name. If you can't, the analysis isn't finished.

    Markdown
    I recommend [action], which should [outcome with a number] for [cost],
    and today I need [the decision, from whom].
    
    Counting our 300 fastest movers every afternoon should cut missing items in
    'Now' orders from 7% to about 5%, worth about $330k a year in margin for a
    $20k build and about $69k a year of staff time, and today I need your
    approval for a 4-week pilot in 20 stores.
  2. Write the situation and complication in two lines each

    The situation is something the reader already accepts. The complication is a change with a number, and it must lead straight to your answer.

  3. Draft five action titles and the appendix

    Write the titles as sentences before building any slide. List what each slide shows and which appendix page backs it.

    Markdown
    ## Deck: daily fast-mover counts (20 min: 5 presenting, 15 discussion)
    1. Daily counts of 300 fast movers can cut missing items in 'Now' orders
       from 7% to about 5%; today I need approval for a 20-store pilot.
       [the ask, the number, the decision]
    2. 4,200 orders a day still lose an item; over half are fast movers we
       count only once a month. [cut rate by month; cuts by item type]
    3. Of three options, daily counts are the only one that is cheap, quick
       to test and easy to stop. [options table: A monthly, B daily, C cameras]
    4. Base case: about $260k a year net margin for a $20k build; even the
       low case pays back in about 3 months. [value table below]
    5. Three gates decide the rollout; scanners come back to you only if the
       pilot shows we need them. [gates, guardrail, today vs later, owners]
    
    Appendix: A cut data by cause | B trial in Ama's store | C cost and staff-time
    model | D shelf-camera quote | E pilot and matched stores | F pre-mortem
  4. Build the money slide with ranges and the kind of money

    Show sales and margin, low, base and high, the costs, the payback, and what you left out. Check every figure with finance before the meeting.

    Output
    Daily fast-mover counts, per year (Mangrove estimates, agreed with finance)
                             Low          Base         High
    Cut-order rate           7% -> 6%     7% -> 5%     7% -> 4%
    Orders saved a day       600          1,200        1,800
    Sales kept ($3 a cut)    $657k        $1.31M       $1.97M
    Margin kept (25%)        $164k        $329k        $493k
    Extra staff time         -$69k        -$69k        -$69k
    Net margin a year        $95k         $260k        $424k
    Build (one-off)          $20k         $20k         $20k
    Payback on the build     ~3 months    ~1 month     under 1 month
    If 320 scanners needed   +$192k: payback about 27 / 10 / 6 months
    Not counted: customers who order less after a cut (being measured)
  5. Write the question bank

    List 15 to 20 questions, rank them, and prepare the top eight like this. Rehearse them aloud with a colleague playing the toughest person in the room.

    Markdown
    | Question                        | From       | One-sentence answer                                   | Where  |
    | Is $1.3M sales or profit?       | MD, finance| Sales; about $330k margin in the base case, and even  | Slide 4|
    |                                 |            | the low case pays back the build in about 3 months.   |        |
    | Why not all 320 stores now?     | MD         | A 320-store routine is costly to undo; the pilot      | Slide 5|
    |                                 |            | shows in 4 weeks if stores keep counting and cuts fall|        |
    | Staff off the floor before the  | Store ops  | Counts run 2-4 pm, pause in the 2 peak weeks, and the | App. C |
    | festival?                       |            | quarterly full count gives back 8 of 12.5 hours.      |        |
    | Is $3 per cut item real?        | Finance    | It is the average price of cut items over 8 weeks; the| App. A |
    |                                 |            | loss is lower if some customers reorder: see low case.|        |
    | Why not the shelf cameras?      | MD         | No trial data and 3 years with no exit; we'd test them| App. D |
    |                                 |            | in parallel if the vendor offers a 6-month pilot.     |        |
    | What if staff type guesses?     | Area mgr   | Random recount of 10 lines a store a week; 95% gate.  | App. F |
    | Are the pilot stores typical?   | MD         | Matched to 20 similar stores; 2 of the 10 busiest are | App. E |
    |                                 |            | in, chosen with store ops.                            |        |
    | Who owns it after rollout?      | MD         | Store ops owns the routine; our team owns the tool.   | Slide 5|
  6. Pre-wire, then follow up within 24 hours

    Meet finance and your likeliest opponent a week before; send the pre-read a day before. After the meeting, send the decision note the same day.

    Markdown
    Subject: Decision: daily-count pilot approved (20 stores, 3 Nov to 30 Nov)
    
    Decided today by the managing director:
    1. Pilot approved in the 20 stores in appendix E, from 3 Nov.
    2. Rollout to all 320 stores pre-approved if all 3 gates pass at the 4 Dec readout.
    3. Scanner purchase not approved; it returns as a separate decision only with queue data.
    
    Actions: Imran, one-minute update every Friday | Head of store ops, brief area
    managers by 31 Oct | Tomás, matched-store baseline by 31 Oct
    Open question: what share of customers reorder after a cut? Tomás, by 14 Nov.
  7. Send the same short update every week

    Status with a reason, the gate numbers, what changed, decisions needed and risks. Keep the format fixed so the reader knows where to look.

    Markdown
    # Daily-count pilot: week 2 of 4 | Status: GREEN (on plan)
    Counts are holding and cut orders in pilot stores fell 0.9 points against
    0.1 in matched stores. Too early to call; readout 4 Dec.
    
    | Measure (gate)             | Target                 | Pilot        | Matched      |
    | Cut-order rate             | 1 pt better than match | 7.1% -> 6.2% | 7.0% -> 6.9% |
    | Counts completed           | at least 85% of days   | 91%          | -            |
    | Recount accuracy           | at least 95%           | 96%          | -            |
    | Receiving time (guardrail) | 20 min or less         | 18 min       | 18 min       |
    
    Changed: 2 stores moved counts to 3-5 pm because deliveries ran late.
    Risk: scanner queues at 3 pm in 2 of 20 stores. Watching; no purchase needed yet.
    Decisions needed from you: none this week. Next update: Friday 21 Nov.

Bring it to your team

Use these when you review a deck or an update before it goes to a leader.

  • If she hears only the first sentence, does she know what we recommend, what it is worth and what we need today?
  • Read only the slide titles aloud. Do they tell the whole story?
  • Is every money figure labelled as sales or margin, with a low case?
  • Who in the room could object, and have we talked to each of them already?
  • What are the eight hardest questions, and who has rehearsed the answers aloud?
  • What do our status colours mean, and would this update still say green if we followed those rules?

Red flags

  • The ask is on the last slide, or there is no slide that says what decision is needed.
  • Thirty slides for a 20-minute meeting.
  • A status that has been green for months on a project everyone privately calls late.
  • Finance sees the numbers for the first time in the meeting.
  • A number invented on the spot to answer a question, which then appears in the minutes.

Practice

Rewrite a bottom-up update, answer first

A PM sent this weekly update about "rain mode" in the Rider app, a feature that gives riders a rain bonus and widens delivery slots when heavy rain starts:

"This week we continued working on rain mode. On Monday we had a design review and Leila changed the alert screen. On Tuesday the vendor delivered build 1.4, which had a bug in the bonus calculation, so we sent it back. Testing in the first city will now start on 18 November instead of 4 November, because of the bug and because rider representatives want to see the bonus rules first. In last month's storms, on-time delivery in rain hours was 61% against 88% normally. We think we can still launch before the heavy-rain season starts in early December but it is tight. We may need a decision about launching without the bonus part."

Rewrite it in the update format from this lesson: status with a reason, numbers, what changed, decisions needed with a date, risks, next update.

  • The first line gives an honest status (amber or red, with a reason) and the new date
  • The decision needed is stated as a choice between named options, with a date by which it must be made
  • The 61% against 88% figure appears as the reason the launch date matters
  • Monday's design review is cut or reduced to a few words
  • Risks name the rider representatives' review and the vendor's fix, each with an owner or a date
Show a model answer

Rain mode: status RED (off plan, decision needed). First-city test moves from 4 Nov to 18 Nov. Launching before the early-December rains is still possible only if we decide by 12 Nov whether to launch without the rider bonus.

Why it matters: in last month's storms, on-time delivery in rain hours was 61%, against 88% normally.

What changed: vendor build 1.4 failed testing (bonus calculation bug); rider representatives asked to review the bonus rules before any test.

Decision needed from you by 12 Nov: (A) launch slot widening and customer messages on 25 Nov without the bonus, adding the bonus later; or (B) wait for the full feature, likely launching after the rains have started.

Risks: vendor fix promised by 14 Nov (owner: PM); bonus rules review with rider representatives on 15 Nov (owner: head of rider operations). Next update: Friday 15 Nov.

Answer four tough questions in one sentence each

You are asking the managing director to approve a "rep mode" in the Partner app. Facts: about 1,500 partner orders a week are phoned to 40 sales reps; about 1 in 12 phone orders is corrected after delivery, and each correction costs about $9 of rep, DC and finance time. Rep mode would let reps enter the order in the app with the shop owner during a visit, so the shop sees it in its own app. Cost: 40 tablets at about $250 each, plus Lagoon Digital's estimate of 3 weeks, about $15,000. Lagoon's last three estimates ran 20 to 40% over. Reps keep their commission on every order in their area. Write a one-sentence answer and one piece of evidence for each question: (1) "What's the payback?" (2) "Why not make every shop use the app?" (3) "Won't the reps feel watched?" (4) "What if Lagoon's estimate is wrong?"

  • Each answer starts with the claim, in one sentence
  • The payback answer shows the arithmetic and a range, not one optimistic number
  • The answer on forcing shops respects why some shops phone, and names a risk of forcing
  • The Lagoon answer uses the 20 to 40% history to set a budget or a contract type
  • Nothing is invented beyond the facts given; unknowns are named as unknowns
Show a model answer

(1) "Between about 5 and 10 months: corrections cost about $58,000 a year (125 a week at $9), and if rep mode removes half to all of them, the $25,000 cost pays back in that range." (2) "Because many of the shops that still phone want to talk to a person, and forcing them risks sending orders to other wholesalers; rep mode gets those orders into the system without asking the shop to change." (3) "Their commission is unchanged and the tool replaces writing orders down and phoning them in; we'll pilot with five reps who volunteer and ask them before we expand." (4) "We budget $21,000, 40% over their estimate, and ask for a fixed price, which is reasonable for a scope this small." In each case, the evidence is the fact the answer rests on: the correction count, the shops' reasons for phoning, the commission rule, Lagoon's track record.

Check yourself

You are on slide 2 of 5 when the managing director says, "Just tell me what you want." What should you do?

A project has reported green for eight weeks. This week the vendor says the go-live date will slip by a month. What does this most likely tell the leader about the team's updates?

The head of finance asks, "What is the payback if the pilot shows we do need the 320 scanners?" You don't remember the figure. What is the best response?

Flashcards

Open my review

Key takeaways

  • Think bottom-up, present top-down: the answer first, then a few grouped reasons, then the evidence.
  • Open with three sentences: the resolution, then the situation and complication that make it necessary.
  • Updates have a fixed shape and status colours with rules. Bring bad news early, privately, with a plan.
  • For a business case, pre-wire finance and your likeliest opponent, show sales and margin with a range, and separate what you need today from what comes later.
  • Answer tough questions in one sentence with one fact, then stop. When you don't know, say so and give a time.

Sources and further reading

Episode transcriptTwenty minutes with the managing director · about 11 minutes · tap any line to play from there
  1. NadiaImran, you've got twenty minutes with the managing director on Thursday. How many slides have you got?
  2. ImranEighteen. Plus the appendix.
  3. NadiaAnd on which slide does she find out what you want?
  4. ImranSlide fourteen. I see where this is going.
  5. NadiaToday is about executive updates and presentations. Leading with the answer, opening with situation, complication and resolution, updates that bring bad news early, the business case for a managing director, and the tough questions.
  6. ImranStart with why slide fourteen is wrong. It's the order I did the work in.
  7. NadiaThat's exactly why it feels right to you. Think about a doctor. You've hurt your ankle and had an X-ray. She walks in and says, good news first, it isn't broken, it's a bad sprain, rest it for a week. Only then does she show you the image.
  8. ImranAnd if she started with the history of ankle injuries, I'd be sweating.
  9. NadiaThen you ask, will I play in the match next month? And she says, I don't know yet. If the swelling is down in ten days, probably. You trust her more for that.
  10. ImranSo answer first, reasons second, evidence for whoever wants it. And an honest I don't know yet.
  11. NadiaThat's the whole lesson in one breath. Now the method behind it. Barbara Minto joined McKinsey in nineteen sixty-three, the firm's first female MBA professional hire, and she taught its consultants to write. Her book, The Pyramid Principle, came out in nineteen eighty-five.
  12. ImranIf you can see the screen, the first diagram is the pyramid. One box at the top, three below it, and three grey boxes at the bottom. If you can't see it, picture a family tree drawn upside down.
  13. NadiaThe top box is the answer, what you recommend and why it matters. Below it, about three reasons, each a full sentence. Below each reason, its evidence. And there are two arrows on the sides. You think bottom-up, from the data to the answer. You present top-down.
  14. ImranMinto also has that word, MECE.
  15. NadiaMutually exclusive, collectively exhaustive. Your reasons shouldn't overlap, and together they should cover the case.
  16. ImranSo for my counts, what are the three reasons?
  17. NadiaThe problem, the fix, and the risk. Seven percent of orders lose an item. Daily counts of three hundred fast movers fix most of it. And the risk is small because it starts as a pilot with gates.
  18. ImranAnd the test is to read only the slide titles.
  19. NadiaYes. If the titles are sentences that tell the whole story, the deck works. If they say background, analysis, options, next steps, she has to do your thinking for you.
  20. ImranOK. Situation, complication, resolution. How does that fit?
  21. NadiaThat's the opening. The situation is something she already agrees with. Now delivery is our promise, and offline receiving took cut orders from nine percent to seven.
  22. ImranAnd the complication?
  23. NadiaWhat changed. Progress has stalled, four thousand two hundred orders a day still lose an item, and more than half are fast movers we only count monthly.
  24. ImranAnd the resolution is my answer. Count those three hundred items every afternoon, starting with a twenty-store pilot.
  25. NadiaWith a senior audience, say the resolution first, and use the situation and complication as the reason. Three sentences, and she knows why she's in the room.
  26. ImranMy usual complication is something like, we want to improve stock accuracy.
  27. NadiaThat's a wish. A complication is a change with a number in it. Stalled for two quarters. Rivals opening in three of our cities. Something that makes doing nothing uncomfortable.
  28. ImranLet's do updates. Once she approves the pilot, she'll want to follow it.
  29. NadiaA one-minute update with the same shape every week. Status in one line with the reason. Three to five numbers against targets, including guardrails. What changed. Decisions needed, with a date, or the words none this week. Risks. And the date of the next update.
  30. ImranDo I use green, amber and red?
  31. NadiaOnly with rules. Green means on plan. Amber means at risk, and the team has a fix that needs no help. Red means off plan, and you need a decision or help from the reader. Without rules you get watermelon reporting.
  32. ImranGreen on the outside, red on the inside.
  33. NadiaEight weeks of green, then one week the vendor says it's a month late. After that, nobody believes your green. The rule underneath is no surprises. Bad news reaches her early, from you, privately, with what you're doing about it.
  34. ImranNow the big one. The business case. What does a managing director actually weigh?
  35. NadiaMoney, meaning margin, cash and payback. Risk, meaning what happens if it fails and whether it can be undone. Customers and competitors. People, the staff who'll work differently. And fit with the strategy she's already agreed. Your five slides should answer all of those before she asks.
  36. ImranFive slides. Down from eighteen.
  37. NadiaThe answer and the decision you need. The problem in numbers. The options on the same criteria. The money, with low, base and high cases. And risks, gates, and what you're asking for today compared with later. Everything else in the appendix.
  38. ImranAnd twenty minutes means five minutes of talking from me.
  39. NadiaAbout five, and about fifteen for discussion, because that's where the decision gets made. And before the meeting, you pre-wire. Toyota calls it nemawashi. You agree the numbers with the head of finance, and you hear the strongest objection from the person most likely to oppose you.
  40. ImranI did that. Finance confirmed the margin and the three dollars per cut item. The head of store operations said her real worry was the festival, so counts now pause in the two peak weeks, and she agreed to come to the meeting.
  41. NadiaAnd what was the first question?
  42. ImranIs that one point three million sales or profit? I said sales. About three hundred and thirty thousand in margin in the base case, and even the low case pays back the build in about three months. Slide four shows both.
  43. NadiaOne sentence, one fact, stop. That's the rhythm. Let's look at it properly.
  44. NadiaThe second diagram is a column of steps with two side exits. Listen to the end. Is it clear? If not, restate it. Do you know? If not, say so and give a time. If yes, a one-line answer, add one fact, then stop and check.
  45. ImranThe hard part for me is the pause. I want to fill the silence.
  46. NadiaTwo seconds of silence gives you time to think, and it looks calm. Filling it is how people end up saying a number they made up.
  47. ImranShe did ask one thing I couldn't answer. How many customers reorder after an item is cut.
  48. NadiaWhat did you say?
  49. ImranThat Tomás is measuring it and I'd send it by the fourteenth.
  50. NadiaPerfect. A wrong number said confidently gets remembered longer than the whole presentation. A date for the real one builds trust.
  51. ImranWhat about the question behind the question?
  52. NadiaWhen she asks, what happens during the festival, she usually means, will this hurt sales in my biggest weeks? So answer both. No. Counts pause in the two peak weeks, and the head of store operations agreed the plan.
  53. ImranAnd when she asks why not all three hundred and twenty stores now?
  54. NadiaTreat it as an option. A routine in three hundred and twenty stores is costly to undo. The pilot answers in four weeks whether stores keep counting and whether cuts fall. And if the gates pass, the rollout starts without coming back to her.
  55. ImranHere's what goes wrong for a lot of PMs, I think. The meeting ends, everyone nods, and two weeks later nobody agrees on what was decided.
  56. NadiaSo say the decision back at the end, in one sentence, and wait for a yes. Then send the note within a day. The decision, the conditions, the actions with owners and dates, and any open questions.
  57. ImranThe Do it section, then. Write the answer in one sentence with a number in every bracket. Two lines each for situation and complication. Five action titles before building any slide. Then the money slide, with sales and margin and a range.
  58. NadiaThen the question bank. Fifteen to twenty questions, ranked, and for the top eight a one-sentence answer, the evidence, and where it lives in the appendix. Rehearse them aloud with someone playing the toughest person in the room.
  59. ImranPre-wire, follow up within a day, and send the same short update every Friday.
  60. ImranQuestions for my team before any deck goes to a leader. If she hears only the first sentence, does she know what we want? Do the slide titles alone tell the story? Is every money figure labelled sales or margin?
  61. NadiaAnd one more. Has finance seen these numbers, or will they see them for the first time in the room?
  62. NadiaA question for you. Take a second. You're on slide two and the managing director says, just tell me what you want. What do you do?
  63. ImranI'd want to ask for two more minutes to finish the context.
  64. NadiaThat's the trap. She's telling you the answer should have come first. Give the decision you need and the one-sentence reason now, and let her steer the rest.
  65. ImranLet me sum up. One: think bottom-up, present top-down, and test it by reading only the titles. Two: updates have a fixed shape, and colours need rules, or green means nothing. Three: answer tough questions in one sentence with one fact, and when I don't know, say so and give a time.
  66. NadiaOne nuance on the third. One sentence first doesn't mean one sentence only. If she wants more, she'll ask, and your appendix is ready. The point is that the answer arrives before the explanation.
  67. ImranNext time?
  68. NadiaNext time, the people around the decision. Stakeholder maps, negotiating with the head of store operations, managing up, disagree and commit, and running product reviews.
Finished reading?Mark it complete to fill in its stop on your course line.

Use it at work

NPV and IRR business case

An investment and its yearly savings: NPV, IRR, a decision and the payback year.

Open in the Finance Lab
Next stopStakeholders, negotiation and leading without authority